Radiant Barrier Installation Methods / Techniques

Below are the most common application installation instructions for our products.  Each installation method indicates basic highlights and provides a link to view the full details of the installation.

To view the detailed installation instructions, please click on the "View Detailed Instructions" link for the method of installation in which you are interested. 

In order to view these detailed installation instructions, you must have Adobe PDF Reader which can be downloaded for free here.

Visit our Tips, Tricks & Techniques page on our website for great advice to consider to help your installation project go easier.

Attic Installations

Over The Attic Floor - Install Highlights
**MOST EFFECTIVE - MAXIMIZES SAVINGS!**

  • Recommended RadiantGUARD® products - Premium or Ultima (must be perforated)
  • Can be rolled out over attic floor joists or over existing insulation (batted or blown-in) on attic floor
  • No taping or stapling necessary
  • Must stay 3" away from any heat sources (canister lights, furnace vents, etc)
  • Must apply to knee walls
  • ** May introduce rare occurrences of condensation in colder climates

View Detailed Instructions

Under Roof Rafters - Install Highlights
  • Recommended RadiantGUARD® products - Ultima (perforated is recommended)
  • Stapled to the underside of the rafters or stapled inside the rafter space at least 3/4" from roof decking
  • Stay 3" away from roof ridge and 3" from bottom edge soffit vents to allow for air flow behind barrier
  • Cut out below all vents
  • Must apply to gable walls.

View Detailed Instructions

Under Roof Decking (Above Rafters) - Install Highlights
  • Recommended RadiantGUARD® products - Premium or Ultima (perforated is recommended)
  • Draped and stapled over the top side of the rafters before roof decking is applied.
  • Stay 3" away from roof ridge and 3" from bottom edge soffit vents to allow for air flow behind barrier
  • Cut out below all vents
  • Must apply to gable walls.

View Detailed Instructions

Cathedral Ceiling - Install Highlights
  • Recommended RadiantGUARD® products - FOIL Double Bubble or Ultima solid.
  • Minimum of 1" gap required next to roof decking for air flow.
  • FOIL Bubble stapled directly to underside of rafters, overlaid with furring strips to which to attach ceiling drywall.

View Detailed Instructions

 

 

 

HVAC Duct Installation

Wall Installations

 

 

Radiant Flooring Installations

Crawl Space Installations

Metal Building Installations

 

 

Post Frame / Pole Barn Installations

 

 

Other Installations

 